Skip to main content
  • Book
  • © 2002

Project Scheduling with Time Windows and Scarce Resources

Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

Part of the book series: Lecture Notes in Economics and Mathematical Systems (LNE, volume 508)

Buy it now

Buying options

eBook USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Other ways to access

This is a preview of subscription content, log in via an institution to check for access.

Table of contents (3 chapters)

  1. Front Matter

    Pages i-xi
  2. Temporal Project Scheduling

    • Klaus Neumann, Christoph Schwindt, Jürgen Zimmermann
    Pages 1-19
  3. Resource-Constrained Project Scheduling — Minimization of Project Duration

    • Klaus Neumann, Christoph Schwindt, Jürgen Zimmermann
    Pages 21-174
  4. Resource-Constrained Project Scheduling — Minimization of General Objective Functions

    • Klaus Neumann, Christoph Schwindt, Jürgen Zimmermann
    Pages 175-299
  5. Back Matter

    Pages 301-340

About this book

A project is a unique undertaking or endeavor to be accomplished that can be divided into individual subtasks or activities each of which requires time and scarce resources for its completion. Also there is a desired objective to be attained (for example, minimization of project duration or of variation of resource utilization, or maximization of net present value of the project). Moreover, there are given precedence relationships among activities prescrib­ ing the order in which activities must be carried out. Project scheduling, in its basic form, consists of finding start times for all activities such that pre­ scribed resource and precedence constraints are satisfied and an objective function is optimized. Since the concept of a project can be interpreted quite broadly, project scheduling problems arise in a great variety of practical situations. These in­ clude construction work, the development and introduction of new products, service systems, or software packages, strategic long-term planning in manu­ facturing and the service sector, emergency planning, and even the conduct­ ing of political campaigns. Recently, project scheduling has been successfully applied to production and operations management, e.g. make-to-order pro­ duction in manufacturing and batch production in process industries. Since the late 1950's, network-based planning methods for project sched­ uling problems have been developed, cf. Elmaghraby (1977) and Moder et al.

Authors and Affiliations

  • Institute for Economic Theory and Operations Research, University of Karlsruhe, Karlsruhe, Germany

    Klaus Neumann, Christoph Schwindt, Jürgen Zimmermann

Bibliographic Information

  • Book Title: Project Scheduling with Time Windows and Scarce Resources

  • Book Subtitle: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

  • Authors: Klaus Neumann, Christoph Schwindt, Jürgen Zimmermann

  • Series Title: Lecture Notes in Economics and Mathematical Systems

  • DOI: https://doi.org/10.1007/978-3-662-22341-3

  • Publisher: Springer Berlin, Heidelberg

  • eBook Packages: Springer Book Archive

  • Copyright Information: Springer-Verlag Berlin Heidelberg 2002

  • eBook ISBN: 978-3-662-22341-3Published: 29 June 2013

  • Series ISSN: 0075-8442

  • Series E-ISSN: 2196-9957

  • Edition Number: 1

  • Number of Pages: XI, 340

  • Number of Illustrations: 61 b/w illustrations

  • Topics: Operations Research/Decision Theory, Organization

Buy it now

Buying options

eBook USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Other ways to access