Skip to main content

Manufacturing Simulation with Plant Simulation and Simtalk

Usage and Programming with Examples and Solutions

  • Book
  • © 2010

Overview

  • Excellent, understandable introductory book for engineers, programmers, practitioners and newcomers

  • Learn Plant Simulation programming in an enjoyable and powerful way

  • Presents a variety of examples and solutions for model building

  • Written by a practitioner for Plant Simulation program users

This is a preview of subscription content, log in via an institution to check access.

Access this book

eBook USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book USD 119.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Other ways to access

Licence this eBook for your library

Institutional subscriptions

Table of contents (12 chapters)

Keywords

About this book

Based on the competition of international production networks, the pressure to - crease the efficiency of production systems has increased significantly. In ad- tion, the number of technical components in many products and as a consequence also the requirements for corresponding assembly processes and logistics pr- esses increases. International logistics networks require corresponding logistics concepts. These requirements can be managed only by using appropriate Digital Factory tools in the context of a product lifecycle management environment, which allows reusing data, supports an effective cooperation between different departments, and provides up-to-date and relevant data to every user who needs it. Simulating the complete material flow including all relevant production, st- age, and transport activities is recognized as a key component of the Digital F- tory in the industry and as of today widely used and accepted. Cutting inventory and throughput time by 20–60% and enhancing the productivity of existing p- duction facilities by 15–20% can be achieved in real-life projects.

Authors and Affiliations

  •   , Zwickau, Germany

    Steffen Bangsow

Bibliographic Information

Publish with us